0

Alan Gibson Wheels and Bearings
EM Gauge (18.2mm)
OO Gauge (16.5mm)
P4/S4 Gauge (18.83mm)
Cooper-Craft
Cooper-Craft 4mm Lineside
Cooper-Craft 16mm Wagons
Cooper-Craft 16mm Lineside
4mm Accessories
4mm Lineside
Wagon Bogies
Etched Tie Bars
Misc. Accessories
Underframe Kits
4mm Cambrian Wagon Kits
4mm Transfers
4mm Transfers Pre-Grouping
4mm Transfers SR
4mm Transfers LMS
4mm Transfers LNER
Private Owner
SR Pre Grouping (LBSC, LSWR, SECR)
SR
LNER
LMS & MR
GWR & Cambrian
BR Salmons and Borail
BR Steel Carriers
BR Engineering
BR Open Wagons
16mmNG
Axleguards
Bogies
Brakegear
Lineside
Loco and Rolling Stock Parts
Signal Parts
Transfers
Wheels
Cooper-Craft Wagon Kits
3mm Wagon Kits
Metal Materials
Brass Micro Section
Brass Flat Section
Brass L Section
Brass T Section
Brass U Section
Brass Z Section
Brass Half Round Section
Brass Half-Round Tube Section
Brass Square Profile
Metal Bar or Rod
Brass Square Bar
Brass Round Bar or Rod
Metal Strip
Brass Strip 0.2mm thick
Brass Strip 0.5mm thick
Nickel Silver Strip 0.3mm thick
Phosphor Bronze Strip 0.15mm thick
Phosphor Bronze Strip 0.3mm thick
Metal Wire
Brass Wire
Phosphor Bronze Wire
Nickel Silver Wire
Soft Iron Wire
Metal Tube
Metal Sheet
Nickel Silver Sheet
PECO-Parkside
4mm Scale OO Gauge Parkside Wagon Kits
Special Orders

C66 SECR/SR 12ton 7 plank Open Wagon Kit

£8.75
Pre-order
Out of stock, available for pre-order
Product Details
Brand: Cambrian
Wheel Type required:: 12mm Open Spoke (early) or 12mm 3 hole Disc (later)
Paint required:: SECR Grey, SR brown or BR grey (see livery below)
Transfers required:: See Instruction Sheet
Other items required:: Couplings, Dummy Coupling Hook and Transfers.
Price Code: B
Weight: 19g

This design was built between 1919 and 1926. They became SR Diagram 1355, and some lasted until about 1970.

RH picture shows an SR built D1355, which all had a sheet rail when new. The last design of LSWR open wagons was very similar. You can see a preserved wagon at the Bluebell Railway.

Construction of the first 480 wagons was during 1919-20 at Ashford (one wagon had been built in 1915). A further 300 were built by Cravens in 1921 and 240 at Ashford in 1922. Then in 1926-7 another 500 were built by the SR at Ashford. All of the SR wagons had sheet rails, and most still had them when withdrawn: those transferred to Dept. use in BR days probably had them removed. A majority of the wagons lasted until the mid 50s, and 71 lasted until as least 1961 in revenue service. Dept. wagons were withdrawn around 1970. Some received metal plates to retain the floor along the bottom of the 1st plank and metal capping on the top edge of the body.

REFERENCES: 'Southern Railway Wagons Vols. 3/4', Bixley, Blackburn, Chorley, King (OPC).

LIVERY: SECR Wagon Grey (P581) – everything except the wheels. SR: Wagon Brown (Precision P91) including solebars, running gear black. BR revenue stock was grey (P126).

There is a SR transfer pack for this kit see CMR066-SR in the transfers section

We stock wheels for this kit in OO, EM and P4/S4.

Save this product for later
Share this product with your friends
C66 SECR/SR 12ton 7 plank Open Wagon Kit
Share by: